Archive
Adobe FrameMaker 7.2 and DITA Live eSeminar (July 11)
Event: Submitted by mhu on Fri, 2006-06-09 21:51. Last updated on Fri, 2006-06-09 22:01.
Location:
http://www.adobe.com/cfusion/event/index.cfm?event=detail&id=462604&loc=en_usDate:
11 Jul 2006 - 05:00 - 06:00Adobe FrameMaker 7.2 - Benefits of Structured Authoring and Migrating In Preparation For XML - Live eSeminar (June 27)
Event: Submitted by mhu on Fri, 2006-06-09 21:48. Last updated on Fri, 2006-06-09 22:06.
Location:
http://www.adobe.com/cfusion/event/index.cfm?event=detail&id=462604&loc=en_usDate:
27 Jun 2006 - 05:00 - 06:00Webinar: Getting Started with DITA
Event: Submitted by teresacheung on Thu, 2006-06-08 18:42.
Location:
https://xmetalevents.webex.com/xmetalevents/onstage/g.php?p=0&t=mDate:
22 Jun 2006 - 05:00 - 06:00Using an XSL-FO to PDF converter other than FOP to work with the DITA Toolkit
Forum topic: Submitted by milox on Thu, 2006-06-08 18:19.
Hey all,
Just started working with the DITA ToolKit, and I've been assigned to onfigure it to use a different PDF renderer than the default FOP.
My investigations have lead me to believe that the main area I need to change is in the ditatargets.xml file. Specifically, the section that deals with FO to PDF conversions.
Just started working with the DITA ToolKit, and I've been assigned to onfigure it to use a different PDF renderer than the default FOP.
My investigations have lead me to believe that the main area I need to change is in the ditatargets.xml file. Specifically, the section that deals with FO to PDF conversions.
bonbayel
How long does it take to go over to DITA?
Blog entry: Submitted by bonbayel on Wed, 2006-06-07 16:29. Last updated on Wed, 2006-06-07 18:04.
The irondog1970 poses a very interesting issue "I imagine a transition from our current writing style to a DITA-based system would take 2 years. And that's a minimum" in Now reading up, that I hope others will respond to.